A fence, garden redesign or new shed can look like a modest project on a recently purchased Washington property. Once digging is involved, underground utilities belong in the plan before the first hole is made. A seller’s sketch or an old set of paint marks should not be treated as a current locate for a new project.
Washington’s Utilities and Transportation Commission explains that the state’s dig law requires a locate request before digging. Puget Sound Energy’s guidance specifies at least two full business days, excluding the day of the request, and distinguishes its own utility lines from privately owned lines. Plan the work around the current instructions and completed responses rather than assuming a call alone makes excavation safe.
Describe the full work area
Give the locate service an accurate description of where work will occur and follow its instructions for identifying the area. Include the actual footprint of the project rather than only the first posthole or planting location. Keep the request number and the responses so that the contractor and owner are working from the same information.
If a response is missing or a mark is unclear, resolve the issue before proceeding. Ask the service or relevant utility what additional action is needed. Do not infer that silence means the area is clear, or use a convenient assumed route to fill a gap in the information.
Account for private lines
PSE states that it marks its own lines and that privately owned utility lines require a separate locating vendor, typically for a fee. Ask what facilities on the property may fall into that category. Connections serving outbuildings or other private improvements deserve particular attention where records are incomplete.
Request available plans from the seller and have the appropriate professionals explain their limits. Such records can help identify questions, but they should not replace the current locating process. Clarify who will arrange any additional locate and how that work fits the project schedule.
Keep the other approvals separate
Utility markings do not establish the property boundary or authorize a fence, deck or other improvement. Review setbacks, recorded restrictions and applicable permit requirements separately. If the work approaches a boundary or easement, obtain the appropriate survey and legal advice before committing to its location.
For a seller completing outdoor work before listing, retain the project records and describe the improvement accurately. For a new owner, taking these steps before ordering materials can prevent a design from depending on an unavailable location. The useful sequence is to define the project, establish the relevant rights and approvals, complete the locating process and have qualified people carry out the work under the applicable safety requirements.